Nova-3 & Ascends Solar PV

JML has successfully secured the first of its kind project from Sembcorp Solar Pte Ltd (“Sembcorp Solar”), for its installation of 9.67MW PV Solar Power for 165 HDB blocks in Jurong, Singapore. Sembcorp Solar, which is the developer of the 50MW project to be implemented over 3 phases: Scopr-A, Scope-B, Scope-C, will provide the basic design of system as well as PV panels with inverter. JML has been selected to execute Scope-B, comprising, of field engineering, procurement other than PV panel & inverter, construction, testing and commissioning. This project  was started in November 2018 and completed by September 2019. SolarNova 3 programme is jointly led by HDB and EDB.  

Key Achievement: 

During the execution, JML developed design and prototype a Build to Edge (BTE) PV Solar design that can increased capacity of each block at average 30- 35%. This design duly approved by all the authorities including SCDF, MOM and HDB and has implemented in SolarNova3 project. Build to Edge design PV has increased significantly the capacity of SN3 phase. 

Sembcorp Solar awarded a “Letter of Commendation” to JML for the development of design and prototype.